Project Overview

An infrastructure contractor working on a residential development in NW Calgary called on DIGS Hydrovac to support utility exposure and installation across the site over several months. The scope grew to cover gas, water, and sanitary infrastructure as the project progressed, with DIGS rotating hydrovac units through the site as new phases of work came up. The engagement reflects the kind of ongoing, evolving support DIGS regularly provides to infrastructure contractors managing multi-utility residential builds.

Scope of Work

DIGS Hydrovac provided:

  •      Gas line locates and hydrovac trenching for gas line installation

  •       Water line and sanitary line locates

  •       Water line and manhole exposure for removal

  •       Trenching across an alley for temporary water mains

  •       Root exposure around trees ahead of excavation

Site Conditions

Work was spread across several blocks in the same NW Calgary development, with utility work concentrated along the 34th Avenue corridor and adjacent streets. The site included established trees near planned excavation routes, requiring careful root exposure to protect them during the work, as well as back-alley access for temporary water main trenching. With gas, water, and sanitary infrastructure all in close proximity, each mobilization required accurate locates before any excavation began.

Execution

DIGS rotated multiple hydrovac units through the development over the course of the project, scheduling crews as new phases of utility work came up. Crews located and exposed gas, water, and sanitary lines ahead of installation and tie-in work, trenched across a back alley to run temporary water mains, and carefully excavated around tree roots to keep mature trees intact during construction. The result was a flexible, ongoing hydrovac program that kept pace with the contractor's shifting scope as the development moved through its phases.

Outcome

DIGS Hydrovac supported the contractor across multiple phases of utility work without disrupting the development's schedule, safely exposing gas, water, and sanitary infrastructure while protecting existing trees and other site features. The project highlights DIGS Hydrovac's ability to sustain a long-running, multi-unit hydrovac program on a residential development as scope and priorities shift over time.