Project Overview
An underground contractor brought DIGS Hydrovac in for an ongoing locating and exposure program along the Memorial Drive and Stoney Trail corridor. Between late August and early November, DIGS returned on 11 working days, using hydrovac excavation to locate and expose power, gas, water, and cathodic protection lines at multiple spots on each visit.
Scope of Work
DIGS Hydrovac provided:
Utility Locates and Daylighting in Multiple Spots
Gas, Power, and Water Line Exposure
Water Main and Hydrant Line Locates
Cathodic Wire and Protection Cable Exposure
Trenching for Power and Cathodic Wires
Site Conditions
Work was spread across several points along the corridor, including the Memorial Drive and Stoney Trail overpass area, with some locates near train tracks. Each visit covered more than one spot, so crews moved from location to location while keeping excavations small and controlled around live infrastructure. The scope also changed from visit to visit as the contractor’s needs developed.
Execution
Early visits focused on locating power, gas, water, and storm lines and daylighting gas and electrical lines at various spots. Through the fall, DIGS exposed water lines and hydrant lines, located cathodic wires near the train tracks, and exposed protection cables so they could be stripped. In early November, crews returned to expose a water main, locate an abandoned water line, and trench out cathodic wires.
Outcome
DIGS Hydrovac supported the contractor across 11 working days over roughly ten weeks, giving the crew accurate exposure of underground infrastructure at each spot as the scope evolved, demonstrating DIGS’s ability to deliver repeat, multi-spot locating and daylighting support.